Technical Feasibility Of Erecting A Wind Turbine On A High Rise Building
Sharpe, Tim and Menon, R. (2008) Technical Feasibility Of Erecting A Wind Turbine On A High Rise Building. In: UNSPECIFIED.
|
|
| Creators/Authors: | Sharpe, Tim and Menon, R. |
|---|---|
| Output Type: | Conference or Workshop Item (UNSPECIFIED) |
| Media of Output: | Proceedings of the 10th World Renewable Energy Congress, Glasgow UK |
| Schools and Departments: | Mackintosh School of Architecture Mackintosh School of Architecture > Mackintosh Environmental Architecture Research Unit (MEARU) |
| Dates: | Date Date Type 25 July 2008 Published |
| Status: | Published |
| Output ID: | 1722 |
| Deposited By: | Tim Sharpe |
| Deposited On: | 21 Nov 2011 11:45 |
| Last Modified: | 17 Dec 2013 14:03 |
GSA Staff Only: request a change | Repository Staff Only: item control page

Lists
Lists